The construction of the MV-101 Microvilla requires a minimum of 2 people. All they need is Cyrus Panels, connectors, building…
Actual Load Test
http://cyruspanel.com/wp-content/uploads/2018/11/1_final-test-complete.movhttp://cyruspanel.com/wp-content/uploads/2018/11/2_finishing-the-unloading.mov A load of 6000kg (120 sacs of cement) was applied on a 10 sq.meter Cyrus Panel floor. The duration…